This three-phase project included two new deep-water shipping berths and multiple 12-inch diameter piping systems to receive petroleum products and ammonia.
The new facility allows three different users to dock and unload cargo simultaneously.
Project scope included the demolition, clean-up excavation, and dredging of the existing 900-foot REK Finger Pier.
Location: Tampa, FL
Owner:
Port Tampa Bay |
Tampa, FL
Architect:
CH2M Hill, Inc. |
Palm Beach Gardens, FL