Wachovia First Street Office Tower
Charlotte, NC
$245,000,000
A 1.5 million-square-foot, 51-story building
is currently under construction atop an
eight-level underground parking deck on a
full city block in Charlotte, NC. The
Wachovia Office Tower will require two of
the strongest tower cranes made along with
a self jacking concrete placing boom to complete
the construction. A unitized
curtainwall system will adorn the exterior of
the building while the office tower itself will
consist of a concrete tube frame construction
with pre-cast double-tee infill between
core and perimeter. The top five levels of
the building are structural steel.
The coordination
of hoisting to support an overall site
footprint of 130,000 square feet is a challenge
in addition to site logistics and a
downtown location.
With multiple pieces of the project going on
simultaneously, coordination of cranes,
materials supply and other deliveries are a
challenge. As the site averages between
1,000 and 2,000 yards of concrete placed
each week, concrete delivery is especially
delicate.
The scheduled completion date of the
Wachovia Office Tower, which is seeking
LEED Gold Certification, is July 15, 2009. |
|
|