Three First Union Office Tower and Parking Deck
Charlotte, NC
$77,000,000
Three First Union Center, a 31-story, 914,000-square-foot office
tower, is located in the central business banking district of Charlotte.
Batson-Cook performed a 23-story build-out on the structure and
completed a seven-level, 925-space parking deck, five levels of
which were underground.
This project is considered a fast-track project because Batson-Cook
built the Tower as it was being designed. All the structural concrete
work was self-performed, which allowed the very critical occupancy
date to be met.
|
|
|